Tuesday, December 9, 2008

Project Plan for Cladding

Name
Steve Turnock
Date
10/12/1989
Project
name
Cladding
Construction steps
How it happens
Tools and Equipment required
1
Cover frames with brown paper to represent sarking, sticking it to frames with masking tape.
Brown paper and Masking tape
2
Put timbers in the internal and external corners with black plastic flashing behind them.
50x50 pine, pilot drill bit, Philips head tech bit, cordless drill, black plastic strip and screws.
3
Put packers at the bottom of the frame so that the bottom of the bottom sheet sticks out on the right angle.
Strips of MDF (off cuts), counter sinking screws, previous drill set up.
4
Cut MDF boards so that they fit snugly in between external and internal corner timbers.
MDF boards, drop saw, measuring tape, pencil.
5
Fix MDF cladding using pilot drill and long screws. Giving 25mm overlap on each sheet and checking for level each time.
MDF cladding, Previous drill set up, screws, level, tape measure and pencil.

No comments: